Senin, 19 November 2012

Agenda Commissioning Test Koridor 4

Agenda Commissioning Test E-Ticketing koridor 4 rencananya akan di adakan pada tanggal 20-21 November 2012. Adapun agenda Commissioning Test adalah sebagai berikut :
A. Hardware
     1. Gate
     2. POS
     3. UCD
     4. BCT
     5. UPS
     6. Switch
     7. USB Modem

B. Software / Aplikasi
     1. Gate
     2. POS EDC
     3. DCU

C. Network
     
D. Transaksi POS EDC
     1. Sales Single Trip Economic Price
     2. Sales Single Trip Regular Price
     3. Re-Top Up Single Trip
     4. Sales Perdana JakCard
     5. Top Up Jak Card

E. Transaksi Gate (Positive Test)
    1. Insert Kartu Single Trip Economic Price
    2. Insert Kartu Single Trip Reguler Trip
    3. Insert Kartu Single Trip Saat Buffer Time 20 Detik
    4. Taping Kartu JakCard

F. Transaksi Gate (Negative Test)
    1. Insert Kartu Single Trip Economic  Price Diatas Jam 07.00 WIB
    2. Taping Kartu Single Trip Regular / Economic Price
    3. Taping Kartu Operasional Kasir

G. Lain-Lain
     1. Listrik
     2. Railing
     3. Emergency Gate
     4. Stiker Card Reader
     5. Petunjuk Arah Masuk / Keluar Pada Gate
     6. Instalasi Kabel dan Grounding

H. Back End System
     1. Download Report Transaksi Single Trip
     2. Download Report Transaksi JakCard

Setelah Commisioning Test disepakati dengan penandatangan Berita Acara, rencana Operasional E-Ticketing Koridor 4 akan dilakukan pada tanggal 23 November 2012.





Tidak ada komentar:

Posting Komentar